Home > Industry knowledge > Content
Categories / CATEGORY
contact us / CONTACT US

Shenzhen White Automation Equipment Co., Ltd.
Company Address: No. 7, Faqiang Road, Liulian Community, Pingdi, Longgang District, Shenzhen
Contact: Mr. Shen

Phone: 17722614040
Phone: 0755-84071674, 84071672
Fax:0755-84071675


E-mail:huaite@vip.163.com
Website: www.huaite.tm

Industry knowledge
The application and installation points of white tape slitting
Edit:Shenzhen White Automation Equipment Co., Ltd.   PublicDate:2018-03-12

WhiteTape slittingThe machine is suitable for the slitting of BOPP sealing tape/cellophane tape. Flat knife slitting, four-axis automatic exchange winding, continuous winding, improving working efficiency; frequency conversion stepless speed regulation, three-stage counting configuration, automatic deceleration stop when running at high speed.The unwinding tension is automatically controlled, and the winding tension is an independent sliding device of the winding shaft. The tension can be adjusted freely. The installation of the tape slitter is also very important. Below we will talk about the main points of the tape slitter installation.

1. The site selection and installation site of the tape slitter must be on a relatively flat hardened ground, because the tape machine needs a good environment during operation, it can not be said that the ground is bumpy, and the various parts of the operation are not coordinated to make production Products are not qualified! This all needs to be considered.

2. The machine is assembled. Generally, the components of the tape machine are separated. Before the installation, after selecting the site, place the front and rear intermediate racks on the horizontal ground to maintain a uniform horizontal line! In order to maintain stable operation.

3. After the installation is complete, perform pre-processing on all parts of the machine, including chains, sprockets, bearings, reducers, adding lubricating oil or grease.

4. After lubricating, debug the main components to keep them rotating smoothly without blocking.

5. After the installation of each part is completed, turn on the power to test the machine! No need to install materials during the test machine, conduct a naked test! Observe the operation of each component! Found abnormal, power off processing,

6. When the belt conveyor is not in operation, the power supply must be disconnected for safety.