Home > news > Installation method of white tape slitting machine
Categories / CATEGORY
contact us / CONTACT US

Shenzhen White Automation Equipment Co., Ltd.
Company Address: No. 7, Faqiang Road, Liulian Community, Pingdi, Longgang District, Shenzhen
Contact: Mr. Shen

Phone: 17722614040
Phone: 0755-84071674, 84071672
Fax:0755-84071675


E-mail:huaite@vip.163.com
Website: www.huaite.tm

news
Installation method of white tape slitting machine
Edit:Shenzhen White Automation Equipment Co., Ltd.   PublicDate:2018-03-12

WhiteTape slitting machineInstallation method

1. Install the front frame, middle frame, and rear frame on a predetermined level on a predetermined position, and align horizontally with the foundation firmly so that the center line of the frame is on a straight line in the longitudinal direction; The rack is offset and shakes to avoid accidents.

2. Install the configured oven on each rack in sequence and fix it with bolts; keep the oven and rack level and stable.

3. Install the power distribution cabinet next to the front rack or in a place where it is convenient to operate, connect all circuits according to the instructions, and finally connect the power supply (be sure to disconnect the power supply when wiring).

4. Install each internal configuration part according to the set position, adjust the level of each intermediate roller, unwinding roller, winding roller, etc., the axes are parallel to each other and perpendicular to the direction of tape movement. During the installation process, the smooth surface of each media can not be scratched, and the correct installation of each component can be maintained.

5. Install the gears, belt pulleys and sprockets, and try to rotate properly to ensure that the rotation is flexible without abnormality and blocking; and add corresponding lubricants to the chain, reducer, etc.

6. Check whether there are any omissions in the installation, and ensure the installation of the heater, the thermal sensor, and the transmission medium; check whether the circuits of the various circuits are connected correctly, and there is no leakage of the wires; whether the entire body is misaligned, and the oven is spaced.

7. After the installation is correct, start the test machine one by one, if there is any abnormality, immediately stop the machine to check and adjust; after the confirmation is completed, start the production (note the personal safety and machine safety during the operation).